Bulgera Gold
OWNERSHIP
100% Norwest Minerals
RESOURCE
23.8Mt @ 0.65g/t Au for 501,000 oz
TENURE
Granted Mining Lease (M52/1085)
LOCATION
200kms North of Meekatharra, Western Australia
Bulgera Gold
Project Overview
The Bulgera Gold Project is Norwest Minerals’ flagship gold asset, located in the highly prospective Plutonic Well Greenstone Belt. The project sits just 50km northeast of the Plutonic Gold Mine (owned by Catalyst Metals) and is strategically positioned near existing infrastructure, including haul roads and processing facilities.

In April 2025, Norwest successfully secured the Mining Lease (M52/1085) for the project, a critical milestone that solidifies the pathway toward production. The project focuses on two parallel value drivers:
1. Near-term cashflow: Developing a low-cost heap leach operation for near-surface oxide ores.
2. Resource expansion: Aggressive drilling to grow the high-grade gold inventory at depth.
Development Strategy: The Heap Leach Pathway
With a significant portion of the resource located in soft, near-surface oxide material, Norwest is advancing a study on a low-capital heap leach operation.
- Early evaluation: A 2024 desktop study by Orelogy Mining Consultants confirmed that a heap leach operation fits entirely within the existing disturbed footprint of the Bulgera Mining Centre.
- Economic Robustness: An updated 2025 review incorporating a A$5,000/oz gold price assumption has demonstrated the potential for strong positive cash flows.
- De-risking: Norwest completed a wide diametre PQ core drilling program in late 2025 to collect oxide and transition material. An Oxide and a Transition bulk sample were prepared and sent to ALS in Perth for metallurgical testing for a maiden Heap Leach Scoping Study and subsequent Pre-Feasibility study. Testwork to date has returned very positive results amenability and gold recovery results.
Mineral Resource Estimate (July 2025)
The new JORC 2012 compliant Mineral Resource for the Bulgera Gold project, applying a 0.24g/t lower Au cut-off, is as follows:


Preliminary Bulgera heap leach design showing PQ core locations, conceptual heap leach infrastructure, areas of surface gold mineralisation, and proposed waste storage areas.
Regional Synergy: Marymia East
Just 10km southeast of Bulgera lies Norwest’s Marymia East Project. Recent drilling (completed late 2025) at the Shiraz Prospect has targeted high-grade gold sources originally identified in historical 1990s data. Success at Marymia East has shown the potential to provide satellite feed to a central processing hub at Bulgera.
Infrastructure & Logistics
- Access: Fully executed Access Agreement with the Marymia Station pastoralist (signed March 2025).
- Proximity: Connected by existing haul roads to the Plutonic Gold Mine (50km away).
- Tenure: Secure Mining Lease granted for 21 years.
SUBSCRIBE TO OUR NEWSLETTER
Sign up to receive news and updates from Norwest Minerals
CONTACT US
Email
info@norwestminerals.com.au
Address
PO Box 140 West Perth WA 6872
PROJECTS
INVESTORS
